The picture was taken outside Serinkent and the pavement on both sides are now like that all of the way up to the Citroen showroom. They are now working their way down towards the beach with the trench to install the new electric cables. Next job is that they have to remove all of the overhead cables and the concrete poles or pylons that supported them. The road has also been dug up from one end to the other to install rainwater drainage and holes dug along the length on both sides installing grids. The phone guys will come along later and dig more holes to install fibre optic. But, we keep telling ourselves, it will all be worth it in the end.